Executive Summary
The Orange Line Metro Train is Pakistan’s first rapid transit metro system, connecting Lahore across a busy 26-station corridor and moving a very large number of commuters every day. A transit network of this scale needs a passenger-screening setup that is fast, reliable, and consistent at every station—without slowing down the flow of daily commuters.
ASG Systems Pakistan was engaged as the solutions and service provider responsible for planning, supplying, and deploying walk-through gate and baggage scanning security infrastructure across the entire Orange Line network, working with technology partner CETEC to source and commission the screening equipment.

The brief
The Challenge
As Pakistan’s first metro rail system, the Orange Line introduced a scale of daily ridership that had no direct precedent in the country’s public transit sector. Security planning for the line needed to address several requirements at once:
- Screen every passenger and their belongings at 26 stations without creating bottlenecks during peak hours.
- Deploy a consistent, standardized checkpoint setup so that screening quality does not vary station to station.
- Select equipment that could withstand continuous, high-frequency daily use in a public transit environment.
- Complete installation and commissioning across the full line within the project’s rollout timeline.
What we delivered
The Solution: Walk-Through Gates & Baggage X-Ray Scanners
ASG Systems Pakistan designed and delivered a standardized security screening checkpoint for every station on the Orange Line, built around two core systems.

Component 01
Walk-Through Gates (Metal Detectors)
Walk-through metal detector gates were installed at station entry points to screen passengers for concealed metallic items as they move through the checkpoint, enabling continuous, non-intrusive screening of commuter traffic.

Component 02
Baggage X-Ray Scanners
X-ray baggage scanners were paired with each walk-through gate to inspect bags and carry-on items in parallel with passenger screening, so that both a passenger and their belongings clear security in a single, coordinated step.

Partner
Technology Partner: CETEC
To equip all 26 stations with reliable, transit-grade screening hardware, ASG Systems Pakistan partnered with CETEC as the technology and equipment partner for the project. This partnership ensured that every checkpoint on the line was fitted with the same standard of walk-through gate and baggage scanning equipment, backed by manufacturer-level product support.
How we did it
Implementation Approach
- 1Site survey and checkpoint layout planning for each of the 26 stations along the corridor.
- 2Procurement and staging of walk-through gates and baggage scanners through partner CETEC.
- 3Phased installation and commissioning across the line to keep station operations on schedule.
- 4Calibration and functional testing of each gate and scanner unit prior to handover.
- 5Coordination with station operations teams for a smooth go-live at every checkpoint.

Outcome
Results & Impact
The completed rollout gave the Orange Line a uniform, line-wide security screening standard for the first time in Pakistan’s metro rail history:
- Full security screening coverage delivered across all 26 stations on the line.
- A consistent passenger and baggage screening experience at every station, regardless of location.
- A scalable checkpoint model that supports the Orange Line’s high daily passenger volumes.
- A dependable equipment base, backed by CETEC, suited for continuous public-transit use.

FAQs
Frequently Asked Questions
What security equipment was installed on the Orange Line Metro Train?
Walk-through metal detector gates and X-ray baggage scanners were installed at all 26 stations, sourced through technology partner CETEC and commissioned by ASG Systems Pakistan.
Who was the technology partner for the Orange Line security project?
CETEC supplied the walk-through gates and baggage X-ray scanners used across the network.
How many Orange Line stations were covered by the security deployment?
All 26 stations along the Orange Line Metro Train corridor in Lahore received a standardized checkpoint.
Planning a security screening deployment for your site?
ASG Systems Pakistan plans, supplies, and installs walk-through gates, baggage scanners, and access-control systems for transit, commercial, and residential sites across Pakistan.