ASG Systems PakistanOur Projects & Success Stories
Real projects delivered by ASG Systems Pakistan across Lahore, Islamabad, Rawalpindi, Multan, Burewala and Hattar: airports, toll plazas, metro and railway stations, defence and government headquarters, banks, hospitals, universities, factories, retail chains and gated communities, planned, supplied, installed and commissioned by our team.
Our work
Featured projects
Each project covers the challenge, the solution, how we implemented it and the results.

Allama Iqbal International Airport
UVSS screening, road blockers, 8 traffic barriers, Find My Car, auto-pay and Pakistan’s first camera-based parking management for 3,500 cars.

Orange Line Metro Train
Walk-through gates and X-ray baggage scanners at all 26 stations of Pakistan’s first metro rail line.

Raya Fairways
Parking management, automated revenue collection, auto-pay stations and self-pay booth machines with Centurion and Comas.

DHA Raya Golf & Country Club
RFID card and e-tag parking access automation with Centurion barriers for members and visitors.

Islamabad Toll Plaza
High-speed Centurion boom barriers for the M-Tag Express Lanes, opening and closing in under 1.3 seconds.

NDMA Headquarters
2 automatic boom barriers, a hydraulic road blocker and a tripod turnstile for layered vehicle and pedestrian access.

CCBPL (Coca-Cola Pakistan)
Heavy-duty gate automation and access control across CCBPL plants nationwide, including Hattar and Multan, from 2019 to 2024.

Nishat Emporium Mall & Hotel
Centurion boom barrier parking access control across the mall gate, hotel driveway and basement parking zones.

University of Lahore
RFID and e-tag access for bikes and cars across the campus, with attendance integration and visitor management.

Askari-XI, Lahore
E-tag resident access, a dedicated visitor lane, tripod pedestrian control and visitor management for 30,000+ residents.

Lahore School of Economics
1.8 km high voltage perimeter electric fence around the LSE campus boundary, with energizer and monitoring equipment.

Lahore Stock Exchange
Centralized vehicle access control at the entry and exit points of a high-security financial institution.

FC College Lahore
Vehicle access control at the main campus gates, managing student, faculty and visitor traffic at peak hours.
Beaconhouse Head Office
Electronic access control at the head office main entry, replacing manual checks with an auditable entry record.

Indus Hospital
2 boom barriers at the hospital’s entry and exit lanes, opening quickly for ambulances and emergency vehicles.

LUMS
2.54 km high voltage electric fence in 12 monitored zones, with a central zone panel and Merlin energizer.

Eighteen, Islamabad
E-tag based traffic barriers that recognise residents’ and members’ vehicles automatically at the entry lanes.

Rawalpindi Railway Station
Vehicle access control at one of the region’s busiest transport hubs, keeping station traffic orderly.

State Bank of Pakistan, Islamabad
High voltage perimeter electric fence adding a continuous deterrent along a sensitive financial institution’s boundary.

PM Helipad, Islamabad
Vehicle access control at a high-security site, restricting entry to authorised vehicles only.

PAF HQ, Islamabad
Traffic barriers with e-tag readers so authorised vehicles are identified automatically at a high-security facility.

Air Headquarters, Islamabad
Traffic barriers with e-tag readers so authorised vehicles are identified automatically at a high-security facility.

Jalal Sons Stores
Security and automation, including electric fences, delivered across every Jalal Sons store in two phases.

Nestlé Burewala Plant
Electronic access control at the plant entry points for staff, contractors and visitors, with an auditable entry record.

Tetra Pak Head Office, Lahore
Automated gates and an access control system for secure, smooth vehicle and staff entry at a corporate head office.

Green Fort 2
E-tag vehicle access, a visitor lane, tripod turnstiles and visitor management software at one controlled entrance.

Fortress Stadium, Lahore
A traffic access automation system at every stadium gate for consistent, controlled vehicle entry and exit.

Mall 1, Lahore
Parking access barriers at the mall’s entry and exit points for orderly vehicle movement at peak hours.

Khayaban-e-Amin
Automatic boom barriers with red/green signal lights for controlled entry and exit at a premier gated community.
Your Project Could Be Next
From a single barrier to a complete airport system, ASG Systems Pakistan plans, supplies, installs and supports security solutions across Pakistan.
